Raymond Limited (Jalgaon) achieved coal savings up to 208 Tons (September 2015 to January 2016) through the replacement of inefficient 10 TPH boiler with 6 TPH boiler.
Raymond Limited (Jalgaon) achieved coal savings up to 208 Tons (September 2015 to January 2016) through the replacement of inefficient 10 TPH boiler with 6 TPH boiler.